Chifley Tower

Project Works: Fit Out and Refurbishment

Builder: Buildcorp

Site Location: Sydney CBD

Alland Group delivered an innovative refurbishment of an office in Sydney’s iconic Chifley Tower, creating a modern, flexible, and future-ready workplace. The project supported a transition to an Agile Work Model designed to enhance collaboration, adaptability, and business growth.

The refurbishment also included upgrades to the base building lobbies on 3 levels, ensuring the workspace met contemporary standards of functionality and design.

Our scope of work included:

  • Temporary power provision with all necessary approvals
  • Upgrades and modifications to distribution switchboards
  • Installation of submain cabling and cable tray systems throughout
  • Advanced lighting and control systems with CBUS DALI, occupancy sensors, and multi-scene programming
  • Emergency and exit lighting compliant with safety regulations
  • UPS system upgrades with minimal downtime
  • Comprehensive communications infrastructure including fibre, CAT6 cabling, patch panels, and wireless access points
  • Installation of general power outlets with clear colour coding
  • Detailed labelling and documentation across all systems

In partnership with Buildcorp and other project collaborators, Alland Group delivered a reliable, efficient, and tailored electrical installation, supporting a modern, innovative, and future-ready workspace.