75 Castlereagh Street, Sydney

Technology has come a long way since the building at 75 Castlereagh Street was constructed in 1986, so with current requirements and the future in mind, a significant upgrade of electrical services was undertaken.

Alland Group were delighted to once again partner with JLL to carry out a significant Design & Construct project across eleven floors of retail and commercial spaces. Understandably, one of the crucial requirements for these works was to keep the building operational at all times.

  • Design and construction fit out providing code compliance, fire rating and services to the following locations:
    • Main switch room.
    • New electrical…

1 Castlereagh Street Sydney

Alland were engaged by Built to complete a challenging refurbishment of this 54-year-old building that included a complex demolition of the concrete encased steel beam’s structure to allow for the modern transformation.

Typical of this period was the use of MIMS – Mineral Insulated Metal Sheath cable, commonly known as Pyrotenax cable, and was utilised for most electrical elements.  This aspect called for a more technical and calculated approach, given the scope involved replacement of the Main Switch Board, common area/ house switchboards, LED lighting upgrades and new infrastructure, all while the building remained a live tenanted site.

Given these logistics…

Central Sydney – Commercial Building

Standing tall overlooking Sydney’s major retail hub this upscale 22 story commercial building boasts not only an impressive view of Sydney, but also a 5.5 NABERS Energy rating.

Staged over a three year period, Alland Group delivered to Built a full Design and Construct project that rejuvenated this central CBD commercial building. These works were concentrated on two impressive custom designer façades and signage lighting, 3 floors of base building works, commercial and office fit outs, along with new switchboards and metering.  Also included were all works associated with an upgrade of communications and lighting, power supply to lifts together…

IBM Sydney

Technology giant IBM has secured a prime location in Sydney’s CBD as their main hub.  As is fitting for one of the world’s most recognised tech companies, their head office at 259 George Street in Sydney’s CBD now provides a perfect example of just how far computers and communications have evolved since the company’s initial presence in Australia in the late1930s.

Alland Group were engaged by Shape to complete a comprehensive fit out of the IBM office space, and transform it into a beautiful, state of the art workplace for over 500 employees. Whilst the abbreviated construction program called for…

Nokia

What was once a heavy industrial area in Rhodes has been reborn into modern residential and mixed commercial spaces. Many businesses and retailers have decided to make this thriving precinct their base.  5 Rider Boulevarde can boast an enviable 5.5 star NABERS rating.

Working closely with Shape, Intelle Building services and Forge Venture Management, this Alland Group Design & Construct project came to life.

Alland Group were engaged to complete a back to base refurbishment on existing tenancy floors (Ground floor, Level 1 and Level 2).  The scope of works included not only the usual requirements of a Make Good project,…

Grant Samuel

Alland Group were engaged by Built to complete a refurbishment of the Grant Samuel offices across two levels in Governor Macquarie Tower.

The works involved the complete fit out of all electrical services to their offices on Level 19 and 20 and consisted of a state of the art Multi-purpose conference room complete with LED linear lighting, a Dynalite Control system integrated with an AV system to control lighting scenes, projector and blinds, as well as wireless access points and a kitchenette.

Other areas featured touch dim lighting, multi-switching track lights and new open space offices with motorised ‘sit to stand’…

Levels 8, 9 & 10, 52 Phillip Street

We are excited to show off the work of our Minor Works division who have completed a high end fitout on three levels of 52 Phillip Street Sydney.  Once again we have partnered with Built to create a stylish and modern workspace, on time and within budget.  Great job team!

300 Parramatta Road

Alland Group has recently completed an exciting refurbishment and commercial fit out at 300 Parramatta Road Auburn. The high profile site is now home to some of Australia’s retail giants, with BCF, Officeworks, Decathlon and RSEA just to name a few. As the premises was well over 20 years old, the logistical task of transforming it into the 21st Century posed many challenges. The end result speaks for itself with a completely overhauled infrastructure and state of the art LED lighting throughout, making this address one the most energy efficient on the Parramatta Road strip.

We are grateful and privileged to…

Yamaha Australia

Alland Group have carried out a full Design and Construct package of two floors and a completely new Communications Room for Yamaha Australia at their Head Office in Wetherill Park.

The works included, full design drawings and calculations for Lighting, Power, Communications, AV and Dry Fire which included – new switchboards, modification works to existing MSB, lighting & power cabling, Cat 6 communications cabling & equipment, new UPS’s and by-pass switches, LED lighting, Dry Fire alterations to existing architectural lighting and AV cabling.

Twelve months prior to commencing site works, Alland Group worked directly with Yamaha and Built to complete the…

B-Pay Fitout Sydney

BPAY is unique on the world stage – it is a critical Australian payments network linking individuals, businesses and Financial Institutions. Owned by the four major Australian banks, BPAY is among Australia’s most recognised brands. BPAY is used by 67% of adult Australians and represents much more than just the best way to pay utility bills. It is now used for online purchases, top ups, and business to business payments.

Alland Group has carried out a full electrical and communications, lighting fit-out to Levels 1 and 2 incorporating specialist lighting, customised LED lighting throughout, Lighting control (C-Bus), emergency and exit…